Placeholder Learn More – Tagged "crack filler" – Pavemade.com


Learn More — crack filler

How Much Crack Filler Do I Need?

Posted by Pavemade on

A standard driveway takes about 6 blocks of hot rubberized crack filler; each 20 lb block covers about 150 linear feet of medium cracks or 200 feet of small cracks.

Read more →


Hot vs. Cold Pour Asphalt Crack Filler: Which Should You Use?

Posted by Pavemade on

Hot pour crack filler lasts 3 to 10+ years and is traffic-ready in minutes but needs a melter; cold pour needs no equipment but takes 24–48 hours to dry and lasts 1–2 years.

Read more →